Mulshi Dam Water for Pune : 8 TMC Quota Approved at CM Fadnavis’ Meeting | When Pune Will Get the Water, Pipeline Plan, Drought and Khadakwasla Storage Explained

Pune has received a major water decision. At a meeting chaired by Chief Minister Devendra Fadnavis, an 8 TMC water quota from Mulshi dam was approved for Pune city. According to the report, the water will be available to Pune in the next one and a half to two years, once the required pipeline and treatment works are completed.

WhatsApp Channel Join Now
Telegram Group Join Now
Instagram Group Join Now
YouTube Channel Subscribe

The decision comes when the state is facing drought because of El Nino and dams around Pune hold less water than last year. Here is what was decided, why it matters and what still needs to happen.

Mulshi Water Decision at a Glance

DetailInformation
Decision8 TMC water quota from Mulshi dam for Pune city
Meeting chaired byCM Devendra Fadnavis
Expected availabilityNext 1.5 to 2 years
Quoted officialNaval Kishore Ram, Pune Municipal Commissioner
Infrastructure neededLarge pipeline, jackwell, water treatment plant
Next stepRemaining issues to be discussed at the next meeting

What the Pune Municipal Commissioner Said

Pune Municipal Commissioner Naval Kishore Ram said the 8 TMC quota had been approved and that the remaining important issues would be discussed at the next meeting (“उर्वरित महत्त्वाच्या विषयांवर पुढच्या बैठकीत चर्चा होईल”). This means the allocation is settled, but funding and project details still have to be worked out.

Mulshi Dam Water For Pune
Mulshi Dam Water For Pune (Source: Election Guru research)

How Much Is 8 TMC?

TMC stands for thousand million cubic feet. One TMC is roughly 28.3 billion litres, so 8 TMC is about 226 billion litres of water a year. For a sense of scale, the Khadakwasla group of dams that supplies Pune is often discussed in terms of around 29 TMC of total storage, so an extra 8 TMC is a very significant addition for the city.

UnitApproximate Value
1 TMCAbout 28.3 billion litres
8 TMCAbout 226 billion litres
8 TMC per day (spread over a year)About 620 million litres a day

Why Pune Needs More Water

  • Population growth: Pune, Pimpri-Chinchwad and the PMRDA area are growing fast with new construction
  • Drought: El Nino has brought drought conditions across Maharashtra this year
  • Lower storage: Khadakwasla and other dams have less water than last year
  • Shared water: Pune’s dams also supply irrigation for farmers downstream, leading to competing demands

Also Read: Maharashtra Drought Aid 2026: ₹5,000 Advance for Farmers

About Mulshi Dam

Mulshi dam is built on the Mula river in Mulshi taluka of Pune district, in the Sahyadri hills west of Pune. It was built by the Tata group in the 1920s mainly for hydroelectric power, with water sent down the ghats to generate electricity for Mumbai. Because its water has traditionally gone towards power generation and the Konkan side, using part of it for Pune city’s drinking water has long been discussed.

What Still Needs to Be Built

ComponentPurpose
Large pipelineCarry water from Mulshi to Pune city
JackwellDraw water from the reservoir and pump it
Water treatment plantMake the water fit for drinking
Distribution networkSupply water to city areas
Detailed project reportCost, route and funding plan

The report says these works will need a detailed project plan and significant funds. That is why the timeline is 1.5 to 2 years rather than immediate supply.

What It Means for Pune Residents

In the short term, nothing changes in the taps; the current drought season will still depend on Khadakwasla, Panshet, Varasgaon and Temghar. In the medium term, the Mulshi quota could reduce Pune’s dependence on the Khadakwasla system and ease the conflict between city supply and irrigation. The pace at which the pipeline project is approved and funded will decide when residents feel the benefit.

Election Guru Analysis

The 8 TMC allocation is one of the biggest water decisions for Pune in recent years. With civic elections in the background and drought hitting the state, the government wants to show long-term planning for the fast-growing city. The real test will be execution: approval of the project report, funding, land for the pipeline and completion within two years.

Watch: Mulshi Dam Water for Pune Video

Mulshi Dam Water for Pune (Short) Video Source : YouTube

For the detailed background, watch the full Election Guru video below.

Election Guru Full Video Source : YouTube

Mulshi Dam Water for Pune FAQ

How much water will Pune get from Mulshi dam?

An 8 TMC water quota from Mulshi dam has been approved for Pune city.

Who approved the Mulshi water quota?

It was approved at a meeting chaired by Chief Minister Devendra Fadnavis.

When will Pune get Mulshi water?

According to the report, the water will be available in the next 1.5 to 2 years.

How much is 8 TMC in litres?

About 226 billion litres, since one TMC is roughly 28.3 billion litres.

What infrastructure is needed?

A large pipeline, jackwell, water treatment plant and related works, which need significant funds.

Why is Pune facing water stress this year?

Drought due to El Nino and lower storage in Khadakwasla and other dams, along with rapid population growth.

Leave a Comment